Fermi Site Office CX Determinations
Determination Date | Name of Action: Description | Categorical Exclusion Number |
---|---|---|
6/11/2024 | Utilities Infrastructure Project | B1.15, B1.16, B1.18, B1.23, B1.34, B1.3, B2.1, B2.5, B4.11, B5.2 |
3/22/2024 | DWS Loop Feed at GCC | B5.5 |
1/29/2024 | Electric Vehicle Charging Station Installations | B5.23 |
6/2/2022 | NEPA EENF for Mahoney Creek Floodplain Construction | B1.33, B2.5 |
6/2/2022 | Mahoney Creek Stormwater Detention Basin CX | B1.33, B2.5 |
3/23/2022 | National Environmental Policy Act Determination at Fermi National Accelerator Laboratory – Nevis Blocks Removal | B1.10; B1.30 |
1/20/2022 | NEPA EENF for LBNF Far Site Process WW for Underground Discharge | B1.6 |
1/20/2022 | LBNF Far Site Process Wastewater for Underground Discharge | B1.6 |
11/3/2021 | National Environmental Policy Act Determination at Fermi National Accelerator Laboratory –Surface Soil Sampling of Proposed Mahoney Creek Floodplain Mitigation Area | B3.1 |
9/22/2021 | Fermilab Welcome and Access Center (FWAC) | B1.15 |