Argonne Site Office CX Determinations
Determination Date | Name of Action: Description | Categorical Exclusion Number |
---|---|---|
4/29/2011 | ASO-CX-283 Building 315 Experiments to Demonstrate Ex-Vessel Core Coolability under Early Cavity Flooding Conditions | B3.6 |
3/21/2011 | ASO-CX-282 Building 211 Operation of the 20 MeV Electron Linac Accelerator and Upgrade to 50 MeV | B3.10 |
5/9/2011 | ASO-CX-284 Construction and Operation of the Advanced Protein Crystallization Facility | B3.6 |
3/3/2011 | ASO-CX-280 Refurbishing of the Quantum Design SQUID Magnetometer | B3.6 |
1/24/2011 | ASO-CX-277 Midwest Photovoltaics Analysis Facility at the Tollway | B3.6 |
1/24/2011 | ASO-CX-278 Building 362 Engine Test Facility Cell #3 Phase II Project | B1.5; B3.6 |
1/25/2011 | ASO-CX-279 Generic Categorical Exclusion: Environment Characterization and Monitoring | B3.1 |
11/3/2010 | ASO-CX-274 Ultra Fast Boriding for Improved Efficiency | B3.6 |
12/1/2010 | ASO-CX-275 Superconducting Cavity Surface Processing Facility | B3.6 |
10/1/2010 | ASO-CX-273 NOvA Neutrino Experiment Construction Project | B3.6; B3.8 |